Standard: | ASTM, JIS, GB, AISI, DIN, BS |
---|---|
Certification: | ISO, RoHS, IBR |
Surface Treatment: | Coated |
Still deciding? Get samples of US$ 200/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The knowledge about GF products:
1) Galfan High Corrosion Resistant Galfan alloy is a low melting point Zn-5% Al-mixed rare earth (<0.01). The alloy is represented by Zn-5AI-MM in the ASTM standard.
2)Corrosion resistance of GI and GALFAN Compared with the salt spray corrosion of other coated steel plates, GaIIan has a life expectancy of 3 times higher than that of ordinary galvanized sheets. Galfan's corrosion resistance is between the ordinary galvanized sheet and Galvalume, and it has excellent steel-based trimming and scratch protection.
3)As for Galfan,usually export AZ100g for thickness ≥0.031″and AZ150g for thickness ≤ 0.031″,Similar to galvalume.
4)For sheet,why the same size has big price different?
Because of the tolerance,if negative tolerance, it will reduce the cost,so if need sheet,please ask the runing meters.(1.0*1000 will has 127.38M)
MESCO STEEL NEVER PROVIDE LOW MATERIAL TO CLIENTS ,11 YEARS,CAN PROMISE OFFER THE COMPETITIVE PRICE FOR THE SAME QUALITY.
--TO BE A RESPECTED SUPPLIER IN CHINA
THE USAGE OF GALFAN PRODUCTS:
In the international market, Galfan products are available in steel coils, coated plates, coated steel wires and steel pipes.
The typical use of the bare-faced Galfan is the "inner cover components of the car, such as:
Oil filter covers, headlamp brackets, covers for electric drives and v-belts.
Galfan has been successfully used for window frame components, Dishwasher enclosures, garage doors, room dividers,
waste bin covers and prefabricated building panels.
ZAM Basic Information in Summary:
Description | GALFAN |
Thickness | 0.14-3.0mm |
Width | 6-1575mm |
Zinc coating | 60G/m2-350g/m2 |
Surface Treatment | Chromed / Skin pass/ Dry / Oil or Unoil |
Coil ID | 508mm/610mm |
Grade | S350 S450 S550 S700 |
Delivery | 7-45 days after down payment |
Payment Terms | TT or LC at sight |
Packing | MESCO Sea Export pakage |
Capacity | 10000MT per month |
MOQ | 25MT/20GP |